Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Waterfront Residence Setbacks

  Dysart
et al
Minden Hills Highlands East Algonquin Highlands
Minimum setback for residence from high water mark 30m 30m 20m 23m
Minimum setback for residence from side lot line 4.5m 4.5m 6m 6m
Maximum extension of deck beyond residence 3m 3.5m 1m  
Minimum distance of leaching bed from high water mark 30m   20m  
Minimum distance of residence from back lot line 7.5m 12m 9m 22m from road centreline
Maximum height for accessory buildings 9.5m 11m 4.5m  
Construction of beach house structure Prohibited Prohibited Prohibited Permitted
Septic bed distance from dug well 30m
Septic bed distance from drilled well 15m
Septic bed distance from house 5m
Septic bed distance from property line 3m
Septic bed distance from water front 15m
Septic tank distance from well 15m
Septic tank distance from house 1.5m
Septic tank distance from property line 3m
Septic tank distance from water front 15m

Contact Hawk River Construction to confirm that setbacks have not been recently changed.


Home | About | Services | Aggregates | Septic Setbacks | Operating Areas | Request Quote | Community | Contact
 

82 Mallard Road | Haliburton, ON | P: 705-457-1386 | F: 705-457-9098
 
© Copyright 2012 Hawk River Construction. All rights reserved. Website Design & Hosting: Dube Designs
Hawk River Facebook page